Risk Based Integrity

It is critical to quantitatively assess the risk of bolted joint integrity. Hex Technology offers a full written report and associated spreadsheet and/or software tool, depending upon your company’s preference. It outlines the method of analysis and delivers comprehensive conclusions and any relevant recommendations. This tool, verified across a range of services and applications, assesses risk based on the current company refinery risk matrix consequence table or by extraction from the piping/equipment RBI assessment.

The draft/report for the client’s scope of work is normally completed within four weeks of receiving all of the required information and a written acknowledgment to proceed. When developing this report and applying this valuable tool, assessments can be made for both piping and pressure vessel bolted joints.